top of page

# Day 4

 

 

 Today at the factory we finished to produce all the elements who can be prefabricated and we started to assemble the different pieces of the view point box. We are excited to see if the elements fit together or not and we struggled a bit but everything seems to be fine.

It has been an hectic day, but luckily it was the waffle-day at the factory! 

 At the site today we finally got to the point were we could start to cast the foundationpoints. We started the day with a lot of crossmeasuring and double checking if all our points were in place. Since the weather today was not really at its best we took a long lunch before going back to do some more doublechecking. We finally placed most of them and everyone was happy. We even celebrated with dessert after dinner!

bottom of page